Vesconite hydro turbine parts replace bronze

Hydro turbine bearing components machined from Vesconite Hilube have been installed at the Crai Water Turbine and Pollok Sawmill Projects in Wales and Scotland.

The UK consultant on hydro-electric turbine design and maintenance on the project had first come to hear about Vesconite bearing materials in 2021, when the restoration projects were still in the conception stage.

The company sent an enquiry for wicket gate bushings and wear rings for the two projects.

The scope of the bushing supply increased and Vesconite Bearings was eventually the supplier of all the plain bearing components in the projects, including the guide vane bushings, runner inlet wear rings, several thrust bearings and the Francis turbine main shaft bearings.

All the parts were delivered in January 2022, installed in the turbines, and despatched to the client in December 2022 after successful factory acceptance tests and some preliminary testing of the bushings under a controlled environment.

Vesconite renewables applications developer Petrus Fourie notes that the previous bearings were made of bronze, but the restoration project necessitated a rethinking of some of the older technology that was in use when the hydro projects were first built.

“People like replacing bronze because they want to eliminate grease from systems in which water is present,” says Fourie.

“Water flushes out the grease ⎻ which pollutes the water. When the grease is flushed out, metal shafts are left unprotected and corrode,” he adds.

Vesconite Hilube bearings are often used in niche hydro-electric applications since they can be machined easily for older equipment with unique designs.

Besides use in huge hydro-power stations, Vesconite Hilube bearing material is also used in smaller projects such as the Crai Project, operated by Welsh Water, and the Pollok Project, operated by the Glasgow Council.

In England, Scotland and Wales, there are many modest hydro projects that could generate 100 to 150 kW of electricity, as many areas are mountainous with significant rainfall.

NEWS CATEGORIES

LATEST NEWS

United Utilities identifies preferred bidder for Haweswater Aqueduct Resilience Programme

United Utilities has announced its preferred bidder to design, build, finance and maintain the replacement of six tunnels sections of the Haweswater Aqueduct, part...

Severn Trent improves stormwater infrastructure with Evenproducts auxiliary tank programme

Severn Trent manages the largest network of storm overflows in the UK, with around 2,472 systems. As part of an industry-leading programme to tackle...

IN FULL FLOW: Low phosphorous consents being achieved at scale

Water company expenditure to reduce nutrients in UK rivers is likely to double in the 2025-2030 investment period, with funding expected for around 900...

Objectively Speaking: How to turn on the digital water taps

In his regular column, Oliver Grievson, Associate Director AtkinsRéalis and Royal Academy of Engineering Visiting Professor at the University of Exeter, asks how we...